Loading...
Loading...
Found 459 Skills
Drafts initial ticket requirements by asking targeted clarifying questions and producing a structured ticket with Title, Body, and Acceptance Criteria. Use when a user has a request that needs to be converted into a clear tracker-ready ticket without codebase or architecture analysis.
Use when working with Python projects that use uv for dependency management, virtual environments, project initialization, or package publishing. Covers setup, workflows, and best practices for uv-based projects.
Review daily Jira worklogs, calculate logged time vs 8h target, suggest existing issues, or create new TL issues and log work when needed.
Create a Plane task in Plane. By default, use the interview skill first to flesh out the issue before creating it; only skip the interview when the user clearly wants a minimal quick capture.
LOAD THIS SKILL when: gathering requirements for new features, user mentions 'requirements', 'requirements-start', 'requirements-end', 'requirements-status', 'requirements-current', 'requirements-list', 'requirements-remind'. Covers structured Q&A workflow with 5-phase requirements gathering, codebase analysis, and spec generation.
Manages existing Elastic Cloud Serverless projects: list, get, update, delete, reset credentials, resume, and load saved credentials. Connects to existing projects by resolving endpoints and acquiring scoped Elasticsearch API keys. Use when performing day-2 operations on serverless projects, connecting to an existing project, loading or resetting project credentials, or looking up project details.
Estimate development cost of a codebase (full repo, branch diff, or single commit). Invoke via /cost-estimate or when user says "estimate cost", "how much would this cost", "development cost". Accepts optional scope args like "branch:feat/foo" or "commit:abc1234".
Use when hierarchical task breakdown is needed, when dependency mapping between tasks is required, when effort estimation and parallelization planning is needed, or when creating work breakdown structures. Triggers on /decompose command, when complex tasks need to be broken into manageable subtasks, when critical path analysis is needed for scheduling, or when identifying tasks that can run concurrently.
End-of-day structured summary and next-session prep. Use at the end of each working day or significant work block.
Set up new project structure with seed file for research workspace. Use when the user wants to start a new project, create a project structure, initialize a new idea, or mentions starting something new.
Initialize TeamBition workspace configuration (credentials, parameters, common projects)
Agent-native CLI for Godot project management, scenes, exports, and script execution.