Loading...
Loading...
Found 49 Skills
Orchestrates task operations. Analyzes Story, builds optimal plan (1-6 implementation tasks), delegates to ln-301-task-creator (CREATE/ADD) or ln-302-task-replanner (REPLAN). Auto-discovers team ID.
Use when design is complete and you need detailed implementation tasks for engineers with zero codebase context - creates comprehensive implementation plans with exact file paths, complete code examples, and verification steps assuming engineer has minimal domain knowledge
This skill should be used when planning and tracking complex feature implementations that require systematic task decomposition. Use this skill to break down large features into manageable, well-documented tasks with clear dependencies, action items, and success criteria. The skill provides a structured template and methodology for iterative planning and tracking throughout implementation.
Comprehensive project planning and documentation generator for software projects. Creates structured requirements documents, system design documents, and task breakdown plans with implementation tracking. Use when starting a new project, defining specifications, creating technical designs, or breaking down complex systems into implementable tasks. Supports user story format, acceptance criteria, component design, API specifications, and hierarchical task decomposition with requirement traceability.
Divide-and-conquer implementation from specs/plans. Decomposes a reference document into independent tasks, assigns each to a builder agent, executes in parallel waves respecting dependencies, then integrates results. Use when you have a spec, PRD, plan, or large feature to implement quickly with parallel execution.
[Planning] Intelligent plan creation with prompt enhancement
Strategic planning specialist for task breakdown, dependency management, timeline estimation, and resource allocation. Manual invocation only - expert at decomposing complex projects into manageable tasks, identifying dependencies, assessing risks, and creating actionable roadmaps. Use when starting complex projects, facing overwhelmed scope, needing structured approaches, or requiring systematic task management before implementation.
P9 Tech Lead mode — write Task Prompts, manage P8 agent teams, never write code yourself. Use when user says 'P9模式', 'tech-lead', '帮我管理这个项目', '任务拆解', or when coordinating 3+ parallel agents. Produces: Task Prompts (六要素) + P8 team delivery.
Generate structured agent prompts with FOCUS/EXCLUDE templates for task delegation. Use when breaking down complex tasks, launching parallel specialists, coordinating multiple agents, creating agent instructions, determining execution strategy, or preventing file path collisions. Handles task decomposition, parallel vs sequential logic, scope validation, and retry strategies.
Use when you have a spec or requirements for a multi-step task, before writing implementation code. Helps break down complex features into bite-sized, verifiable tasks.
Builds multi-layer features as vertical end-to-end slices instead of horizontal layers. Each slice is verified before the next begins. Use when: starting any task that spans 2+ layers (DB, API, UI, tests), building CRUD features, implementing multi-step flows, decomposing features into subtasks, or planning implementation order.
REQUIRED skill for planning and designing coding tasks before implementation. Use this skill when: (1) User asks to "plan", "design", "create a plan", or "think before coding" (2) Complex tasks requiring multiple files or steps (3) Tasks involving both backend and frontend changes (4) Breaking down ambiguous requirements into concrete tasks This skill ensures plans are properly documented, saved as markdown, reviewed by subagent, and registered as todos before any code is written. Do NOT skip this skill for non-trivial tasks.