deploy-checklist

Original🇺🇸 English
Translated

Pre-deployment verification checklist. Use when about to ship a release, deploying a change with database migrations or feature flags, verifying CI status and approvals before going to production, or documenting rollback triggers ahead of time.

3installs
Added on

NPX Install

npx skill4agent add anthropics/knowledge-work-plugins deploy-checklist

/deploy-checklist

If you see unfamiliar placeholders or need to check which tools are connected, see CONNECTORS.md.
Generate a pre-deployment checklist to verify readiness before shipping.

Usage

/deploy-checklist $ARGUMENTS

Output

markdown
## Deploy Checklist: [Service/Release]
**Date:** [Date] | **Deployer:** [Name]

### Pre-Deploy
- [ ] All tests passing in CI
- [ ] Code reviewed and approved
- [ ] No known critical bugs in release
- [ ] Database migrations tested (if applicable)
- [ ] Feature flags configured (if applicable)
- [ ] Rollback plan documented
- [ ] On-call team notified

### Deploy
- [ ] Deploy to staging and verify
- [ ] Run smoke tests
- [ ] Deploy to production (canary if available)
- [ ] Monitor error rates and latency for 15 min
- [ ] Verify key user flows

### Post-Deploy
- [ ] Confirm metrics are nominal
- [ ] Update release notes / changelog
- [ ] Notify stakeholders
- [ ] Close related tickets

### Rollback Triggers
- Error rate exceeds [X]%
- P50 latency exceeds [X]ms
- [Critical user flow] fails

Customization

Tell me about your deploy and I'll customize the checklist:
  • "We use feature flags" → adds flag verification steps
  • "This includes a database migration" → adds migration-specific checks
  • "This is a breaking API change" → adds consumer notification steps

If Connectors Available

If ~~source control is connected:
  • Pull the release diff and list of changes
  • Verify all PRs are approved and merged
If ~~CI/CD is connected:
  • Check build and test status automatically
  • Verify pipeline is green before deploy
If ~~monitoring is connected:
  • Pre-fill rollback trigger thresholds from current baselines
  • Set up post-deploy metric watch

Tips

  1. Run before every deploy — Even routine ones. Checklists prevent "I forgot to..."
  2. Customize once, reuse — Tell me your stack and I'll remember your deploy process.
  3. Include rollback criteria — Decide when to roll back before you deploy, not during.