Generates a sprint or milestone retrospective by analyzing completed work, velocity, blockers, and patterns. Produces actionable insights for the next iteration.
npx skill4agent add donchitos/claude-code-game-studios retrospectivesprint-Nmilestone-nameproduction/retrospectives/retro-[sprint-slug]-*.mdproduction/sprints/sprint-[N]-retrospective.mdproduction/retrospectives/retro-[milestone-name]-*.mdAskUserQuestion[A] Update existing — load it and add/revise sections with new data[B] Start fresh — generate a new retrospective (archive the old one)-archived-[date]production/sprints/production/milestones/production/sprint-status.yaml"No sprint data found for [sprint/milestone]. Runto generate sprint data first, or provide the sprint details manually."/sprint-status
AskUserQuestion2>/dev/nullBash: git log --oneline --since="4 weeks ago" 2>/dev/null || git log --oneline -20--sinceproduction/retrospectives/## Retrospective: [Sprint N / Milestone Name]
Period: [Start Date] -- [End Date]
Generated: [Date]
### Metrics
| Metric | Planned | Actual | Delta |
|--------|---------|--------|-------|
| Tasks | [X] | [Y] | [+/- Z] |
| Completion Rate | -- | [Z%] | -- |
| Story Points / Effort Days | [X] | [Y] | [+/- Z] |
| Bugs Found | -- | [N] | -- |
| Bugs Fixed | -- | [N] | -- |
| Unplanned Tasks Added | -- | [N] | -- |
| Commits | -- | [N] | -- |
### Velocity Trend
| Sprint | Planned | Completed | Rate |
|--------|---------|-----------|------|
| [N-2] | [X] | [Y] | [Z%] |
| [N-1] | [X] | [Y] | [Z%] |
| [N] (current) | [X] | [Y] | [Z%] |
**Trend**: [Increasing / Stable / Decreasing]
[One sentence explaining the trend]
### What Went Well
- [Observation backed by specific data or examples]
- [Another positive observation]
- [Recognize specific contributions or decisions that paid off]
### What Went Poorly
- [Specific issue with measurable impact -- e.g., "Feature X took 5 days
instead of estimated 2, blocking tasks Y and Z"]
- [Another issue with impact]
- [Do not assign blame -- focus on systemic causes]
### Blockers Encountered
| Blocker | Duration | Resolution | Prevention |
|---------|----------|------------|------------|
| [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] |
### Estimation Accuracy
| Task | Estimated | Actual | Variance | Likely Cause |
|------|-----------|--------|----------|--------------|
| [Most overestimated task] | [X] | [Y] | [+Z] | [Why] |
| [Most underestimated task] | [X] | [Y] | [-Z] | [Why] |
**Overall estimation accuracy**: [X%] of tasks within +/- 20% of estimate
[Analysis: Are we consistently over- or under-estimating? For which types of
tasks? What adjustment should we apply?]
### Carryover Analysis
| Task | Original Sprint | Times Carried | Reason | Action |
|------|----------------|---------------|--------|--------|
| [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] |
### Technical Debt Status
- Current TODO count: [N] (previous: [N])
- Current FIXME count: [N] (previous: [N])
- Current HACK count: [N] (previous: [N])
- Trend: [Growing / Stable / Shrinking]
- [Note any areas of concern]
### Previous Action Items Follow-Up
| Action Item (from Sprint N-1) | Status | Notes |
|-------------------------------|--------|-------|
| [Previous action] | [Done / In Progress / Not Started] | [Context] |
### Action Items for Next Iteration
| # | Action | Owner | Priority | Deadline |
|---|--------|-------|----------|----------|
| 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] |
| 2 | [Another action] | [Who] | [Priority] | [When] |
### Process Improvements
- [Specific change to how we work, with expected benefit]
- [Another improvement -- keep it to 2-3 actionable items, not a wish list]
### Summary
[2-3 sentence overall assessment: Was this a good sprint/milestone? What is
the single most important thing to change going forward?]production/retrospectives/retro-sprint-[N]-[date].mdproduction/retrospectives/retro-[milestone-name]-[date].mdproduction/retrospectives/AskUserQuestion[A] Yes — open sprint planning with retro action items and velocity delta pre-populated[B] No — I'll reference the retrospective file manually when I'm ready/sprint-plan new/gate-check