Loading...
Loading...
This skill should be used when the user asks to "stop scope creep", "limit revision rounds", "write SOW revision language", "the client keeps asking for changes", "how do I say this is out of scope", "translate vague feedback", "client said make it pop", or "write a change-order email". It provides revision-cap contract language, a consolidated-feedback request, a vague-feedback translator, and a polite out-of-scope email.
npx skill4agent add iart-ai/freelance-motion-skills client-revisionsA note arrives.
├─ Is it vague ("make it pop", "feels off")?
│ └─ YES → translate to a decidable choice + ask for a timestamp.
│ Do NOT act yet. Re-classify once it's concrete.
└─ Is it concrete?
├─ Does it change something ALREADY approved in brief/board?
│ (timing, palette colour, approved-copy edit, a fix)
│ └─ YES → REVISION. Counts against the round cap. Do it.
└─ Is it anything NOT in the approved brief/board?
(new scene, +runtime, new concept, new ratio, new asset,
reversing an approved decision, "let's also try…")
└─ YES → NEW REQUEST. Send the change-order email. Quote it.
Do NOT silently absorb it.
Is feedback scattered across people/messages?
└─ YES → STOP. Send the consolidated-feedback request first; one
document, all stakeholders, conflicts resolved by the client.REVISIONS
This project includes [2] rounds of revisions. A "round" is one
consolidated set of feedback, collected from all stakeholders and
delivered in a single document, then addressed in full.
Included (a revision): changes to elements already approved in the
brief and storyboard — timing, pacing, colours from the agreed
palette, approved copy edits, and fixes.
Not included (a new request / change order): new scenes, added
runtime, new concepts or directions, additional formats or aspect
ratios, new assets not previously supplied, or feedback that
reverses a previously approved decision.
New requests are quoted as a change order before work proceeds and
may affect the timeline. Additional revision rounds beyond those
included are billed at [day rate]. Feedback split across multiple
messages may be treated as separate rounds.Subject: Feedback on [project] — Round [N]
Hi [name],
Ready for your notes on V[n]. To turn these around fast and cleanly,
could you send everything in one go:
• Gather feedback from everyone who needs to weigh in and merge it
into a single list (if two notes conflict, tell me which wins).
• Use timestamps where you can — "at 0:08 the logo feels slow."
• Tell me the problem, not the fix — "the intro drags" is more useful
than "make it faster," because it lets me solve it properly.
• Flag any must-have vs nice-to-have.
Send it all together and I'll address the full set in this round.
Notes that arrive after, or in separate messages, may roll into the
next round. Thanks!| Client says | Ask back |
|---|---|
| "Make it pop" | "More saturated colour, faster pacing, bigger scale moves, or stronger sound? Point to a second that already pops." |
| "It feels off" | "Off in pacing, colour, type, or message? Which 2 seconds feel most wrong?" |
| "Make it more premium" | "Slower easing, more space, restrained palette, or refined type — which one?" |
| "Can it be more dynamic?" | "More camera movement, faster cuts, or more elements in motion?" |
| "I don't love it" | "What specifically — and what would 'loving it' look like? A reference helps." |
| "Make it bigger / stronger" | "Larger scale, bolder type, higher contrast, or more screen time?" |
| "Something's missing" | "A scene, a message, a brand element, or energy? Where in the timeline?" |
| "Can we punch it up?" | "Pacing, colour, or sound? Show me a moment that already has the energy you want." |
Subject: [project] — quick note on the new request
Hi [name],
Happy to help with [the new request] — flagging that it sits outside
the approved brief/storyboard, so it's a change rather than a revision
under our current scope.
Here's what it takes:
• Work: [what's involved]
• Cost: [amount / day estimate]
• Timeline impact: [+X days / new delivery date]
If you'd like to go ahead, reply "approved" and I'll add it and update
the schedule. If you'd rather keep to the original scope and budget,
no problem — we'll proceed as planned and can revisit this later.
Either way works for me; just let me know which you prefer.Client: "The intro feels off." → You: "Off in pacing, colour, or message — and which 2 seconds feel worst?" → Client: "The first 3 seconds drag before the logo." → You re-time the entrance (a revision, within scope), log it as Round 1. One question turned a feeling into a precise, in-scope fix.
Client: "Love it! Can we also do a square version and add a quick outro scene?" → You quietly build both, eat 2 extra days, and the project runs late and unprofitable.
| Symptom | Why it happens | Fix |
|---|---|---|
| Endless rounds, never "final" | No cap defined, or cap not cited | State the cap in the SOW before round 1; cite it at round N+1 |
| Conflicting notes, redo loops | Acted on per-person feedback | Require one consolidated doc; client resolves conflicts |
| Margin gone on "tiny tweaks" | New requests absorbed as revisions | Classify every note; new work → change order with a price |
| Acted on "make it pop," still wrong | Executed a vague note literally | Translate to a decidable choice + timestamp before touching the file |
| Reworking an approved scene | Approval gate not locked | Lock each stage in writing; reopening a locked stage = new request |
| Feedback dribbles in for days | No single submission deadline | One round = one document; later notes roll to the next round |
| Client feels nickel-and-dimed | Change orders framed as "no" | Frame as a visible trade-off (proceed or park), never as refusal |
| Situation | Move |
|---|---|
| Feedback dribbling in per-person | Send consolidated-feedback request; restart the round |
| "Make it pop" | Translate to concrete options + ask for a timestamp |
| Client requests a 4th round | Cite SOW cap; quote extra round at day rate |
| "Just one tiny new scene" | Change-order email; it's new work |
| Reversing an approved decision | New request, not a revision |
| New aspect ratio added late | Change order — separate format = separate deliverable |
| Two stakeholders conflict | Require client to pick the winning note before work |
references/sow-clauses.mdreferences/email-templates.mdreferences/feedback-translator.md