ln-220-story-coordinator

Compare original and translation side by side

🇺🇸

Original

English
🇨🇳

Translation

Chinese

Story Coordinator

Story 协调器

Universal Story management coordinator that delegates CREATE/REPLAN operations to specialized workers after building IDEAL Story plan.
通用Story管理协调器,在构建完理想的Story计划后,将创建/重新规划操作委托给专用处理模块。

When to Use This Skill

何时使用此技能

Use when:
  • Decompose Epic to User Stories (5-10 Stories covering Epic scope)
  • Update existing Stories when Epic requirements change
  • Rebalance Story scopes within Epic
  • Add new Stories to existing Epic structure
适用于以下场景:
  • 将Epic分解为用户Story(5-10个,覆盖Epic全部范围)
  • 当Epic需求变更时更新现有Story
  • 重新平衡Epic内的Story范围
  • 向现有Epic结构中添加新Story

Core Pattern: Decompose-First

核心模式:先分解

Key principle: Build IDEAL Story plan FIRST, THEN check existing Stories to determine mode:
  • No existing Stories → CREATE MODE (delegate to ln-221-story-creator)
  • Has existing Stories → REPLAN MODE (delegate to ln-222-story-replanner)
Rationale: Ensures consistent Story decomposition based on current Epic requirements, independent of existing Story structure (may be outdated).
核心原则: 先构建理想的Story计划,再检查现有Story以确定执行模式:
  • 无现有Story → 创建模式(委托给ln-221-story-creator)
  • 存在现有Story → 重新规划模式(委托给ln-222-story-replanner)
设计理由: 确保基于当前Epic需求进行一致的Story分解,不受可能已过时的现有Story结构影响。

Story Numbering Convention

Story编号规范

MANDATORY READ: Load
shared/references/numbering_conventions.md
for Story numbering rules (US001 sequential across Epics, no Story 0).
必读要求: 加载
shared/references/numbering_conventions.md
查看Story编号规则(US001跨Epic连续编号,无Story 0)。

How It Works

工作流程

Phase 1: Context Assembly

阶段1:上下文收集

Objective: Gather context for Story planning (Epic details, planning questions, frontend context, fallback docs, user input)
Step 1: Discovery (Automated)
Auto-discovers from
docs/tasks/kanban_board.md
:
  1. Team ID: Reads Linear Configuration table
  2. Epic: Parses Epic number from request → Validates in Linear → Loads Epic description
    • User format: "Epic N" (Linear Project number, e.g., "Epic 7: OAuth Authentication")
    • Query:
      get_project(query="Epic N")
      → Fetch full Epic document
    • Extract: Goal, Scope In/Out, Success Criteria, Technical Notes (Standards Research if Epic created by ln-210 v7.0.0+)
    • Note: Epic N = Linear Project number (global), NOT initiative-internal index (Epic 0-N)
  3. Next Story Number: Reads Epic Story Counters table → Gets next sequential number
Step 2: Extract Planning Information (Automated)
Parses Epic structure for Story planning questions:
QuestionExtraction Source
Q1 - User/PersonaEpic Goal ("Enable [persona]...") + Scope In (user roles)
Q2 - What they wantEpic Scope In (capabilities) + functional requirements
Q3 - Why it mattersEpic Success Criteria (metrics) + Goal (business value)
Q4 - Which EpicAlready from Step 1
Q5 - Main ACDerive from Epic Scope In features → testable scenarios
Q6 - Application typeEpic Technical Notes (UI/API mentioned) → Default: API
Step 3: Frontend Research (Optional)
Trigger: If Q2 (capabilities) OR Q5 (AC) missing after Step 2
Process:
  1. Scan HTML files:
    Glob
    **/*.html
    ,
    src/**/*.html
  2. Extract:
    • Forms → AC scenarios (e.g.,
      <form id="login">
      → "Given valid credentials, When submit, Then login success")
    • Buttons/Actions → capabilities (e.g.,
      <button id="register">
      → "User registration")
    • Validation rules → edge case AC (e.g.,
      minlength="8"
      → "Given password <8 chars, Then error")
  3. Combine with Epic context, deduplicate, prioritize Epic AC if conflict
Fallback: If no HTML → Skip to Step 4
Step 4: Fallback Search Chain
Objective: Fill missing Q1-Q6 BEFORE asking user.
For each question with no answer from Step 2-3:
QuestionFallback Search
Q1 (User/Persona)Search
requirements.md
for "User personas", "Actors" → Default "User" if not found
Q3 (Why it matters)Search
requirements.md
for "Business objectives", "Goals" → Infer from Epic Success Criteria
Q6 (Application type)Search
tech_stack.md
for "Frontend", "Backend", "API" → Default "API"
Skip: Q2, Q5 (Epic + HTML are sources of truth), Q4 (already known)
Step 5: User Input (Only if Missing)
If still missing after Step 2 + 3 + 4:
  • Show extracted: "From Epic: [Epic info]. From HTML: [HTML info]. From fallback: [fallback info]"
  • Ask user to confirm or provide remaining missing details
If all questions answered from Epic OR HTML OR fallback: Skip user prompts, proceed to Phase 2
Output: Complete context (Epic details, next Story number, Q1-Q6 answers)

目标: 收集Story规划所需的上下文信息(Epic详情、规划问题、前端上下文、备用文档、用户输入)
步骤1:自动发现
docs/tasks/kanban_board.md
自动发现以下信息:
  1. 团队ID: 读取Linear配置表
  2. Epic信息: 从请求中解析Epic编号 → 在Linear中验证 → 加载Epic描述
    • 用户输入格式: "Epic N"(Linear项目编号,例如"Epic 7: OAuth Authentication")
    • 查询方式:
      get_project(query="Epic N")
      → 获取完整Epic文档
    • 提取内容: 目标、包含/排除范围、成功标准、技术说明(若Epic由ln-210 v7.0.0+创建,需包含标准研究内容)
    • 注意: Epic N为全局Linear项目编号,而非倡议内部索引(Epic 0-N)
  3. 下一个Story编号: 读取Epic Story计数器表 → 获取下一个连续编号
步骤2:自动提取规划信息
解析Epic结构以获取Story规划所需的问题答案:
问题提取来源
Q1 - 用户/角色Epic目标("为[角色]提供...") + 包含范围(用户角色)
Q2 - 用户需求Epic包含范围(功能) + 功能需求
Q3 - 业务价值Epic成功标准(指标) + 目标(商业价值)
Q4 - 所属Epic已从步骤1获取
Q5 - 核心验收标准(AC)从Epic包含范围的功能推导 → 可测试场景
Q6 - 应用类型Epic技术说明(提及UI/API) → 默认值:API
步骤3:前端研究(可选)
触发条件: 步骤2后Q2(功能)或Q5(AC)仍缺失
流程:
  1. 扫描HTML文件:使用
    Glob
    匹配
    **/*.html
    src/**/*.html
  2. 提取内容:
    • 表单 → AC场景(例如
      <form id="login">
      → "给定有效凭证,当提交时,登录成功")
    • 按钮/操作 → 功能(例如
      <button id="register">
      → "用户注册")
    • 验证规则 → 边界场景AC(例如
      minlength="8"
      → "给定密码长度<8位,显示错误")
  3. 与Epic上下文合并,去重,若存在冲突则优先采用Epic的AC
备用方案: 若无HTML文件 → 跳至步骤4
步骤4:备用搜索链
目标: 在询问用户前填充Q1-Q6中缺失的信息
针对步骤2-3后仍无答案的问题:
问题备用搜索来源
Q1(用户/角色)
requirements.md
中搜索"User personas"、"Actors" → 若未找到则默认"User"
Q3(业务价值)
requirements.md
中搜索"Business objectives"、"Goals" → 从Epic成功标准推导
Q6(应用类型)
tech_stack.md
中搜索"Frontend"、"Backend"、"API" → 默认值:API
跳过: Q2、Q5(Epic + HTML为权威来源),Q4(已明确)
步骤5:用户输入(仅当信息仍缺失时)
若步骤2+3+4后仍有缺失:
  • 展示已提取信息:"来自Epic:[Epic信息]。来自HTML:[HTML信息]。来自备用搜索:[备用信息]"
  • 请求用户确认或补充剩余缺失的细节
若所有问题已从Epic/HTML/备用搜索得到答案: 跳过用户提示,进入阶段2
输出: 完整的上下文信息(Epic详情、下一个Story编号、Q1-Q6答案)

Phase 2: Standards Research (Delegated)

阶段2:标准研究(委托)

Objective: Research industry standards/patterns BEFORE Story generation to ensure implementation follows best practices.
Why: Prevents outdated patterns or RFC violations (e.g., OAuth without PKCE).
Process:
  1. Parse Epic for domain keywords: Extract domain from Epic goal/Scope In (authentication, rate limiting, payments)
  2. Delegate to ln-001-standards-researcher:
    • Call
      Skill(skill: "ln-001-standards-researcher", epic_description="[Epic full description]", story_domain="[domain]")
    • Wait for Standards Research (Markdown string)
  3. Store: Cache for Phase 5a/5b (workers insert in Story Technical Notes)
Output: Standards Research stored for ALL Stories in Epic
Skip conditions:
  • Epic has NO standards in Technical Notes
  • Story domain is trivial CRUD
  • Epic says "research not needed"
Time-box: 15-20 minutes (handled by ln-001)
Note: Research done ONCE per Epic, results reused for all Stories (5-10 Stories benefit from single research)

目标: 在生成Story前研究行业标准/模式,确保实现遵循最佳实践。
原因: 避免使用过时模式或违反RFC规范(例如OAuth未使用PKCE)。
流程:
  1. 解析Epic的领域关键词: 从Epic目标/包含范围提取领域(认证、限流、支付等)
  2. 委托给ln-001-standards-researcher:
    • 调用
      Skill(skill: "ln-001-standards-researcher", epic_description="[完整Epic描述]", story_domain="[领域]")
    • 等待标准研究结果(Markdown字符串)
  3. 存储: 缓存结果供阶段5a/5b使用(处理模块会将其插入Story技术说明)
输出: 为Epic中所有Story存储的标准研究结果
跳过条件:
  • Epic技术说明中无标准相关内容
  • Story领域为简单CRUD操作
  • Epic明确标注"无需研究"
时间限制: 15-20分钟(由ln-001处理)
注意: 每个Epic仅执行一次研究,结果可复用给所有Story(5-10个Story共享单次研究成果)

Phase 3: Planning

阶段3:规划

Objective: Build IDEAL Story plan, determine execution mode
Story Grouping Guidelines:
Each Story = ONE vertical slice of user capability (end-to-end: UI → API → Service → DB).
✅ GOOD Story Grouping (1 Story = 1 user journey):
  • ✅ "User registration" (form → validation → API → database → email)
  • ✅ "Password reset" (request link → verify token → set password → update DB)
  • ✅ "Product search" (input → filter/sort → API → DB query → display)
❌ BAD Story Grouping (horizontal slices):
  • ❌ "Create user table" (database only, no user value → Task, not Story)
  • ❌ "User registration API endpoint" (API layer only, not vertical)
  • ❌ "Registration UI form" (frontend only, not vertical)
Rule: 1 Story = 1 user capability = 3-5 AC = 6-20 hours = 10-28 tests
Database Creation Principle (Incremental Schema Evolution):
Each Story creates ONLY the tables it needs (not all tables upfront).
✅ GOOD (Incremental):
  • ✅ "User registration" → Creates Users table
  • ✅ "Product search" → Creates Products table
  • ✅ "Order checkout" → Creates Orders, Payments tables
❌ BAD (Big-Bang):
  • ❌ "Setup database" → Creates all 50 tables (no user value, violates vertical slicing)
  • ❌ "Database schema" → Creates Users, Products, Orders, Payments upfront
Rationale: Big-bang database setup violates incremental delivery. Each Story should deliver user value, not technical infrastructure.
Build IDEAL Plan (Automated):
  1. Analyze Epic Scope: Review features in Epic Scope In, identify user capabilities
  2. Determine Story Count:
    • Simple Epic (1-3 features): 3-5 Stories
    • Medium Epic (4-7 features): 6-8 Stories
    • Complex Epic (8+ features): 8-10 Stories
    • Max 10 Stories per Epic
  3. Story Size Guidelines:
CriterionMinMaxUnder-decomposedOver-decomposed
AC35>5 AC (split)<3 AC (merge)
Duration6h20h>20h (split)<6h (merge)
Tests1028>28 tests (split)<10 tests (merge)
Over-decomposition indicators:
  • ❌ <3 AC, <6 hours, <10 tests
  • ❌ Purely technical (no user value)
  • ❌ Title starts with "Add", "Create", "Update" (likely Task)
  • ❌ Crosses only 1-2 layers (not vertical)
  1. Build IDEAL Plan "in mind":
    • Each Story: persona + capability + business value
    • Each Story: 3-5 testable AC (Given-When-Then)
    • Stories ordered by dependency
    • Each Story: Test Strategy section exists but is empty (tests planned later by ln-510-test-planner)
    • Each Story: Technical Notes (architecture, integrations, Standards Research from Phase 2, guide links)
  2. AC Quality Validation (CRITICAL - delegates to workers):
Workers (ln-221, ln-222) must validate AC quality:
Completeness Check (3 scenario types required):
  • Happy Path (1-2 AC): main success scenarios
  • Error Handling (1-2 AC): invalid inputs, auth failures, system errors
  • Edge Cases (1 AC): boundary conditions, special states, race conditions
Example: ❌ BAD: "User can login" (only happy path) ✅ GOOD:
  • AC1: Valid credentials → login success (happy path)
  • AC2: Invalid password → 401 error (error handling)
  • AC3: Account locked → 403 error (edge case)
Specificity Check (measurable outcomes required):
  • ✅ HTTP status codes (200, 401, 403, 404)
  • ✅ Measurable performance (<200ms, 99% uptime)
  • ✅ Exact error messages ("Invalid credentials")
Example: ❌ BAD: "Login should be fast" (vague) ✅ GOOD: "Then receive token <200ms" (measurable)
INVEST Checklist:
CriterionCheck✅ GOOD❌ BAD
IndependentCan develop/deploy without blocking others + NO forward dependencies"Request OAuth token" (Story N uses only N-1)"Validate token depends on Story N+2 refresh flow" (forward dependency!)
NegotiableAC focus on WHAT, not HOW"User gets valid token" (what)"Use authlib 1.3.0, store in Redis" (how)
ValuableClear business value"User refreshes expired token to maintain session""Add token_refresh table" (no user value)
EstimableCan estimate 6-20hClear scope, known patterns, researched standards"Implement authentication" (too vague)
SmallFits 1-2 sprints3-5 AC, 6-20h"Full OAuth flow" (>5 AC, >20h)
TestableAC measurable"Given valid refresh token, Then receive token <200ms""Token refresh should be fast" (not measurable)
Output: IDEAL Story plan (5-10 Stories) with titles, statements, core AC, ordering

目标: 构建理想的Story计划,确定执行模式
Story分组指南:
每个Story = 一个用户功能的垂直切片(端到端:UI → API → 服务 → 数据库)。
✅ 合理的Story分组(1个Story = 1个用户旅程):
  • ✅ "用户注册"(表单 → 验证 → API → 数据库 → 邮件)
  • ✅ "密码重置"(请求链接 → 验证令牌 → 设置密码 → 更新数据库)
  • ✅ "产品搜索"(输入 → 筛选/排序 → API → 数据库查询 → 展示)
❌ 不合理的Story分组(水平切片):
  • ❌ "创建用户表"(仅数据库操作,无用户价值 → 属于任务,非Story)
  • ❌ "用户注册API端点"(仅API层,非垂直切片)
  • ❌ "注册UI表单"(仅前端,非垂直切片)
规则: 1个Story = 1个用户功能 = 3-5条AC = 6-20小时工作量 = 10-28个测试用例
数据库创建原则(增量 schema 演进):
每个Story仅创建自身所需的表(而非提前创建所有表)。
✅ 合理方式(增量):
  • ✅ "用户注册" → 创建Users表
  • ✅ "产品搜索" → 创建Products表
  • ✅ "订单结算" → 创建Orders、Payments表
❌ 不合理方式(大爆炸式):
  • ❌ "设置数据库" → 创建全部50张表(无用户价值,违反垂直切片原则)
  • ❌ "数据库schema" → 提前创建Users、Products、Orders、Payments表
设计理由: 大爆炸式数据库设置违反增量交付原则。每个Story应交付用户价值,而非仅技术基础设施。
构建理想计划(自动化):
  1. 分析Epic范围: 回顾Epic包含范围的功能,识别用户功能
  2. 确定Story数量:
    • 简单Epic(1-3个功能):3-5个Story
    • 中等Epic(4-7个功能):6-8个Story
    • 复杂Epic(8+个功能):8-10个Story
    • 每个Epic最多10个Story
  3. Story规模指南:
标准最小值最大值分解不足过度分解
AC数量35>5条AC(需拆分)<3条AC(需合并)
工作量6h20h>20h(需拆分)<6h(需合并)
测试用例数1028>28个测试用例(需拆分)<10个测试用例(需合并)
过度分解的迹象:
  • ❌ <3条AC、<6小时工作量、<10个测试用例
  • ❌ 纯技术任务(无用户价值)
  • ❌ 标题以"Add"、"Create"、"Update"开头(大概率为任务)
  • ❌ 仅涉及1-2个层级(非垂直切片)
  1. 构建理想计划:
    • 每个Story:角色 + 功能 + 商业价值
    • 每个Story:3-5条可测试AC(Given-When-Then格式)
    • Story按依赖关系排序
    • 每个Story:包含测试策略部分但为空(测试用例后续由ln-510-test-planner规划)
    • 每个Story:技术说明(架构、集成、阶段2的标准研究结果、指南链接)
  2. AC质量验证(关键 - 由处理模块执行):
处理模块(ln-221、ln-222)必须验证AC质量:
完整性检查(需包含3种场景类型):
  • 正常流(1-2条AC):主要成功场景
  • 错误处理(1-2条AC):无效输入、认证失败、系统错误
  • 边界场景(1条AC):边界条件、特殊状态、竞争条件
示例: ❌ 不合理:"用户可以登录"(仅包含正常流) ✅ 合理:
  • AC1:给定有效凭证,登录成功(正常流)
  • AC2:给定无效密码,返回401错误(错误处理)
  • AC3:给定锁定账户,返回403错误(边界场景)
具体性检查(需可衡量结果):
  • ✅ HTTP状态码(200、401、403、404)
  • ✅ 可衡量性能(<200ms、99%可用性)
  • ✅ 精确错误信息("Invalid credentials")
示例: ❌ 不合理:"登录速度应快"(模糊) ✅ 合理:"在200ms内收到令牌"(可衡量)
INVEST checklist:
标准检查内容✅ 合理❌ 不合理
独立性可独立开发/部署,无前置依赖"请求OAuth令牌"(Story N仅依赖N-1)"令牌验证依赖Story N+2的刷新流程"(存在前置依赖!)
可协商性AC聚焦于做什么,而非怎么做"用户获取有效令牌"(做什么)"使用authlib 1.3.0,存储在Redis"(怎么做)
价值性明确商业价值"用户刷新过期令牌以维持会话""添加token_refresh表"(无用户价值)
可估算性可估算6-20小时工作量范围明确、模式已知、标准已研究"实现认证功能"(过于模糊)
规模适中可在1-2个迭代内完成3-5条AC、6-20小时工作量"完整OAuth流程"(>5条AC、>20小时)
可测试性AC可衡量"给定有效刷新令牌,在200ms内收到新令牌""令牌刷新速度应快"(不可衡量)
输出: 理想的Story计划(5-10个Story),包含标题、描述、核心AC、排序

Phase 4: Check Existing & Detect Mode

阶段4:检查现有Story并确定模式

Objective: Determine execution mode based on existing Stories AND user intent
Process:
Query Linear for existing Stories in Epic:
list_issues(project=Epic.id, label="user-story")
Mode Detection:
  1. Analyze user request for keywords:
    • ADD keywords: "add story", "one more story", "additional story", "append"
    • REPLAN keywords: "update plan", "revise", "requirements changed", "replan stories"
  2. Decision matrix:
ConditionModeDelegate To
Count = 0CREATEPhase 5a: ln-221-story-creator
Count ≥ 1 AND ADD keywordsADDPhase 5c: ln-221-story-creator (appendMode)
Count ≥ 1 AND REPLAN keywordsREPLANPhase 5b: ln-222-story-replanner
Count ≥ 1 AND ambiguousASK USER"Add new Story or revise the plan?"
Important: Orchestrator loads metadata ONLY (ID, title, status). Workers load FULL descriptions (token efficiency).
Output: Execution mode determined + existingCount for workers

目标: 根据现有Story和用户意图确定执行模式
流程:
查询Linear中该Epic下的现有Story:
list_issues(project=Epic.id, label="user-story")
模式检测:
  1. 分析用户请求的关键词:
    • 添加类关键词:"add story"、"one more story"、"additional story"、"append"
    • 重新规划类关键词:"update plan"、"revise"、"requirements changed"、"replan stories"
  2. 决策矩阵:
条件模式委托对象
现有Story数量=0创建模式阶段5a:ln-221-story-creator
现有Story数量≥1且包含添加类关键词添加模式阶段5c:ln-221-story-creator(appendMode)
现有Story数量≥1且包含重新规划类关键词重新规划模式阶段5b:ln-222-story-replanner
现有Story数量≥1且意图模糊询问用户"添加新Story还是修改现有计划?"
重要提示: 协调器仅加载元数据(ID、标题、状态)。处理模块加载完整描述(提升令牌效率)。
输出: 确定的执行模式 + 现有Story数量(供处理模块使用)

Phase 5a: Delegate CREATE (No Existing Stories)

阶段5a:委托创建模式(无现有Story)

Trigger: Epic has no Stories yet (first decomposition)
Delegation:
Call ln-221-story-creator via Skill tool:
javascript
Skill(
  skill: "ln-221-story-creator",
  epicData: {id, title, description},
  idealPlan: [ /* 5-10 Stories from Phase 3 */ ],
  standardsResearch: "Standards Research from Phase 2",
  teamId: "team-id",
  autoApprove: false  // or true for automation
)
Worker handles:
  • Generate Story documents (8 sections, insert Standards Research)
  • Validate INVEST criteria
  • Show preview
  • User confirmation (if autoApprove=false)
  • Create in Linear (project=Epic, labels=user-story, state=Backlog)
  • Update kanban_board.md (Epic Grouping Algorithm)
Output: Created Story URLs + summary from worker

触发条件: Epic尚无Story(首次分解)
委托方式:
通过Skill工具调用ln-221-story-creator:
javascript
Skill(
  skill: "ln-221-story-creator",
  epicData: {id, title, description},
  idealPlan: [ /* 阶段3的5-10个Story */ ],
  standardsResearch: "阶段2的标准研究结果",
  teamId: "team-id",
  autoApprove: false  // 自动化场景设为true
)
处理模块负责:
  • 生成Story文档(8个部分,插入标准研究结果)
  • 验证INVEST标准
  • 展示预览
  • 用户确认(若autoApprove=false)
  • 在Linear中创建(项目=Epic,标签=user-story,状态=Backlog)
  • 更新kanban_board.md(Epic分组算法)
输出: 已创建的Story链接 + 处理模块返回的摘要

Phase 5b: Delegate REPLAN (Existing Stories Found)

阶段5b:委托重新规划模式(存在现有Story)

Trigger: Epic already has Stories (requirements changed)
Delegation:
Call ln-222-story-replanner via Skill tool:
javascript
Skill(
  skill: "ln-222-story-replanner",
  epicData: {id, title, description},
  idealPlan: [ /* 5-10 Stories from Phase 3 */ ],
  standardsResearch: "Standards Research from Phase 2",
  existingCount: N,
  teamId: "team-id",
  autoApprove: false  // or true for automation
)
Worker handles:
  • Load existing Stories (Progressive Loading: ONE BY ONE for token efficiency)
  • Compare IDEAL vs existing (KEEP/UPDATE/OBSOLETE/CREATE operations)
  • Show replan summary with diffs (AC, Standards Research, Technical Notes)
  • User confirmation (if autoApprove=false)
  • Execute operations (respecting status constraints: Backlog/Todo only, warnings for In Progress/Review/Done)
  • Update kanban_board.md (add NEW Stories only via Epic Grouping Algorithm)
Output: Operation results + warnings + affected Story URLs from worker

触发条件: Epic已有Story(需求变更)
委托方式:
通过Skill工具调用ln-222-story-replanner:
javascript
Skill(
  skill: "ln-222-story-replanner",
  epicData: {id, title, description},
  idealPlan: [ /* 阶段3的5-10个Story */ ],
  standardsResearch: "阶段2的标准研究结果",
  existingCount: N,
  teamId: "team-id",
  autoApprove: false  // 自动化场景设为true
)
处理模块负责:
  • 加载现有Story(渐进式加载:逐个加载以提升令牌效率)
  • 对比理想计划与现有Story(确定保留/更新/废弃/创建操作)
  • 展示重新规划摘要及差异(AC、标准研究、技术说明)
  • 用户确认(若autoApprove=false)
  • 执行操作(遵循状态约束:仅操作Backlog/Todo状态的Story,对In Progress/Review/Done状态的Story发出警告)
  • 更新kanban_board.md(仅通过Epic分组算法添加新Story)
输出: 操作结果 + 警告信息 + 受影响的Story链接

Phase 5c: Delegate ADD (Append to Existing Stories)

阶段5c:委托添加模式(向现有Story中追加)

Trigger: Epic has Stories, user wants to ADD more (not replan existing)
Delegation:
Call ln-221-story-creator via Skill tool with appendMode:
javascript
Skill(
  skill: "ln-221-story-creator",
  appendMode: true,  // ADD to existing, don't replace
  epicData: {id, title, description},
  newStoryDescription: userRequestedStory,  // Single Story from user request
  standardsResearch: "Standards Research from Phase 2",
  teamId: "team-id",
  autoApprove: false
)
Key differences from CREATE MODE:
  • appendMode: true
    → Skip full IDEAL plan, create only requested Story
  • newStoryDescription
    → User's specific request (e.g., "add authorization Story")
  • Does NOT require Phase 3 IDEAL plan for all Stories
  • Preserves existing Stories without comparison
Worker handles:
  • Research standards for NEW Story only
  • Generate Story document (8 sections)
  • Validate INVEST criteria
  • Create in Linear (append to existing)
  • Update kanban_board.md
Output: Created Story URL + summary from worker
TodoWrite format (mandatory): Add phases to todos before starting:
- Phase 1: Context Assembly (in_progress)
- Phase 2: Standards Research via ln-221 (pending)
- Phase 3: Build IDEAL Story Plan (pending)
- Phase 4: Check Existing Stories (pending)
- Phase 5: Delegate to ln-222/ln-223 (pending)
- Wait for worker result (pending)
Mark each as in_progress when starting, completed when done.


触发条件: Epic已有Story,用户希望添加新Story(不修改现有内容)
委托方式:
通过Skill工具调用ln-221-story-creator并设置appendMode:
javascript
Skill(
  skill: "ln-221-story-creator",
  appendMode: true,  // 追加到现有Story,不替换
  epicData: {id, title, description},
  newStoryDescription: userRequestedStory,  // 用户请求的单个Story
  standardsResearch: "阶段2的标准研究结果",
  teamId: "team-id",
  autoApprove: false
)
与创建模式的核心差异:
  • appendMode: true
    → 跳过完整理想计划,仅创建用户请求的Story
  • newStoryDescription
    → 用户的具体请求(例如"add authorization Story")
  • 无需阶段3的完整理想计划
  • 保留现有Story,不进行对比
处理模块负责:
  • 仅为新Story进行标准研究
  • 生成Story文档(8个部分)
  • 验证INVEST标准
  • 在Linear中创建(追加到现有Story)
  • 更新kanban_board.md
输出: 已创建的Story链接 + 处理模块返回的摘要
TodoWrite格式(必填): 开始前需将阶段添加到待办事项:
- Phase 1: Context Assembly (in_progress)
- Phase 2: Standards Research via ln-221 (pending)
- Phase 3: Build IDEAL Story Plan (pending)
- Phase 4: Check Existing Stories (pending)
- Phase 5: Delegate to ln-222/ln-223 (pending)
- Wait for worker result (pending)
开始阶段时标记为in_progress,完成后标记为completed。


Integration with Ecosystem

生态系统集成

Calls:
  • ln-001-standards-researcher (Phase 2) - research standards/patterns for Epic
  • ln-221-story-creator (Phase 5a, 5c) - CREATE and ADD worker
  • ln-222-story-replanner (Phase 5b) - REPLAN worker
Called by:
  • ln-200-scope-decomposer (Phase 3) - automated full decomposition (scope → Epics → Stories)
  • Manual - user invokes for Epic Story creation/replanning
Upstream:
  • ln-210-epic-coordinator - creates Epics (prerequisite for Story creation)
Downstream:
  • ln-300-task-coordinator - creates implementation tasks for each Story
  • ln-310-story-validator - validates Story structure/content
  • ln-400-story-executor - orchestrates task execution for Story

调用的模块:
  • ln-001-standards-researcher(阶段2)- 为Epic研究标准/模式
  • ln-221-story-creator(阶段5a、5c)- 创建和添加Story的处理模块
  • ln-222-story-replanner(阶段5b)- 重新规划Story的处理模块
被以下模块调用:
  • ln-200-scope-decomposer(阶段3)- 自动化完整分解(范围 → Epics → Stories)
  • 手动触发 - 用户调用以创建/重新规划Epic的Story
上游依赖:
  • ln-210-epic-coordinator - 创建Epic(Story创建的前置条件)
下游依赖:
  • ln-300-task-coordinator - 为每个Story创建实现任务
  • ln-310-story-validator - 验证Story结构/内容
  • ln-400-story-executor - 协调Story的任务执行

Definition of Done

完成定义

✅ Phase 1: Context Assembly Complete:
  • Team ID, Epic number, Next Story Number loaded from kanban_board.md
  • Q1-Q6 extracted from Epic (Step 2)
  • Frontend Research attempted if Q2/Q5 missing (Step 3)
  • Fallback Search attempted for missing info (Step 4)
  • User input requested if still missing (Step 5)
  • Complete Story planning context assembled
✅ Phase 2: Standards Research Complete:
  • Epic parsed for domain keywords
  • ln-001-standards-researcher invoked with Epic description + Story domain
  • Standards Research cached for workers
  • OR Phase 2 skipped (trivial CRUD, no standards, explicit skip)
✅ Phase 3: Planning Complete:
  • Epic Scope analyzed
  • Optimal Story count determined (5-10 Stories)
  • IDEAL Story plan created (titles, statements, core AC, ordering)
  • Story Grouping Guidelines validated (vertical slicing)
  • INVEST checklist validated for all Stories
✅ Phase 4: Check Existing Complete:
  • Queried Linear for existing Stories (count only)
  • Execution mode determined (CREATE or REPLAN)
✅ Phase 5: Delegation Complete:
  • Called ln-221-story-creator (Phase 5a) OR ln-222-story-replanner (Phase 5b) via Skill tool
  • Passed epicData, idealPlan, standardsResearch, teamId, autoApprove
  • Received output from worker (Story URLs + summary + next steps)

✅ 阶段1:上下文收集完成:
  • 从kanban_board.md加载团队ID、Epic编号、下一个Story编号
  • 从Epic提取Q1-Q6(步骤2)
  • 若Q2/Q5缺失则尝试前端研究(步骤3)
  • 为缺失信息尝试备用搜索(步骤4)
  • 若仍缺失则请求用户输入(步骤5)
  • 完成Story规划上下文收集
✅ 阶段2:标准研究完成:
  • 解析Epic的领域关键词
  • 调用ln-001-standards-researcher并传入Epic描述+Story领域
  • 缓存标准研究结果供处理模块使用
  • 或跳过阶段2(简单CRUD、无标准、明确标注无需研究)
✅ 阶段3:规划完成:
  • 分析Epic范围
  • 确定最优Story数量(5-10个)
  • 创建理想的Story计划(标题、描述、核心AC、排序)
  • 验证Story分组指南(垂直切片)
  • 验证所有Story符合INVEST标准
✅ 阶段4:检查现有Story完成:
  • 查询Linear中的现有Story(仅统计数量)
  • 确定执行模式(创建或重新规划)
✅ 阶段5:委托完成:
  • 通过Skill工具调用ln-221-story-creator(阶段5a)或ln-222-story-replanner(阶段5b)
  • 传入epicData、idealPlan、standardsResearch、teamId、autoApprove
  • 接收处理模块返回的输出(Story链接+摘要+下一步操作)

Example Usage

示例用法

CREATE MODE (First Time):
"Create stories for Epic 7: OAuth Authentication"
Process:
  1. Phase 1: Context Assembly → Discovery (Team "API", Epic 7, US004), Extract (Persona: API client, Value: secure API access), Frontend Research (HTML login/register forms → AC), Fallback Search (requirements.md for personas)
  2. Phase 2: Standards Research → Epic mentions "OAuth 2.0", delegate ln-001 → Standards Research with RFC 6749, patterns
  3. Phase 3: Planning → Build IDEAL (5 Stories: "Register client", "Request token", "Validate token", "Refresh token", "Revoke token")
  4. Phase 4: Check Existing → Count = 0 → CREATE MODE
  5. Phase 5a: Delegate CREATE → Call ln-221-story-creator → US004-US008 created with Standards Research
REPLAN MODE (Requirements Changed):
"Replan stories for Epic 7 - removed custom token formats, added scope management"
Process:
  1. Phase 1: Context Assembly → Discovery (Team "API", Epic 7, has US004-US008), Extract (Removed custom formats, added scopes)
  2. Phase 2: Standards Research → Epic mentions "OAuth 2.0 scopes", delegate ln-001 → Updated Standards Research with RFC 6749 Section 3.3
  3. Phase 3: Planning → Build IDEAL (5 Stories: "Register client", "Request token", "Validate token", "Refresh token", "Manage scopes")
  4. Phase 4: Check Existing → Count = 5 → REPLAN MODE
  5. Phase 5b: Delegate REPLAN → Call ln-222-story-replanner → KEEP 4, UPDATE Technical Notes (scope research), OBSOLETE US008, CREATE US009

创建模式(首次分解):
"Create stories for Epic 7: OAuth Authentication"
流程:
  1. 阶段1:上下文收集 → 发现(团队"API"、Epic7、US004)、提取(角色:API客户端,价值:安全API访问)、前端研究(HTML登录/注册表单 → AC)、备用搜索(requirements.md中的角色)
  2. 阶段2:标准研究 → Epic提及"OAuth 2.0",委托ln-001 → 包含RFC 6749及相关模式的标准研究结果
  3. 阶段3:规划 → 构建理想计划(5个Story:"注册客户端"、"请求令牌"、"验证令牌"、"刷新令牌"、"撤销令牌")
  4. 阶段4:检查现有Story → 数量=0 → 创建模式
  5. 阶段5a:委托创建 → 调用ln-221-story-creator → 创建US004-US008并包含标准研究结果
重新规划模式(需求变更):
"Replan stories for Epic 7 - removed custom token formats, added scope management"
流程:
  1. 阶段1:上下文收集 → 发现(团队"API"、Epic7、已有US004-US008)、提取(移除自定义令牌格式、添加范围管理)
  2. 阶段2:标准研究 → Epic提及"OAuth 2.0 scopes",委托ln-001 → 更新包含RFC 6749第3.3节的标准研究结果
  3. 阶段3:规划 → 构建理想计划(5个Story:"注册客户端"、"请求令牌"、"验证令牌"、"刷新令牌"、"管理范围")
  4. 阶段4:检查现有Story → 数量=5 → 重新规划模式
  5. 阶段5b:委托重新规划 → 调用ln-222-story-replanner → 保留4个Story、更新技术说明(范围研究)、废弃US008、创建US009

Reference Files

参考文件

  • [MANDATORY] Problem-solving approach:
    shared/references/problem_solving.md
  • Orchestrator lifecycle:
    shared/references/orchestrator_pattern.md
  • Auto-discovery patterns:
    shared/references/auto_discovery_pattern.md
  • Decompose-first pattern:
    shared/references/decompose_first_pattern.md
  • Numbering conventions:
    shared/references/numbering_conventions.md
    (Story sequential across Epics)

  • [必填] 问题解决方法:
    shared/references/problem_solving.md
  • 协调器生命周期:
    shared/references/orchestrator_pattern.md
  • 自动发现模式:
    shared/references/auto_discovery_pattern.md
  • 先分解模式:
    shared/references/decompose_first_pattern.md
  • 编号规范:
    shared/references/numbering_conventions.md
    (Story跨Epic连续编号)

Best Practices

最佳实践

Story Content:
  • Research-First: Always perform Phase 2 research (standards/patterns) before Story generation
    • Story level: STANDARDS/PATTERNS (OAuth RFC 6749, middleware pattern)
    • Task level: LIBRARIES (authlib vs oauthlib) - delegated by ln-300
  • Business-oriented Stories: Each Story = USER JOURNEY (what user does, what they get), NOT technical tasks
    • ✅ GOOD: "As API client, I want to refresh expired token, so that I maintain session without re-authentication"
    • ❌ BAD: "Create token refresh endpoint in API" (Task, not Story)
  • Vertical Slicing: Each Story delivers end-to-end functionality (UI → API → Service → DB)
  • One capability per Story: Clear, focused persona + capability + value
  • Testable AC: Given-When-Then, 3-5 AC, specific criteria ("<200ms" not "fast")
  • Test Strategy: Section exists but is empty at Story creation (tests planned later by ln-510-test-planner)
  • Standards Research: Include Phase 2 research in ALL Story Technical Notes
Story Decomposition:
  • Decompose-First: Build IDEAL plan before checking existing - prevents anchoring to suboptimal structure
  • INVEST validation: Validate every Story against INVEST criteria
  • Size enforcement: 3-5 AC, 6-20 hours
  • Avoid over-decomposition: <3 AC, <6 hours → Merge Stories
User Interaction:
  • Epic extraction: Try to extract all planning info from Epic in Phase 1 Step 2 before asking user
  • Frontend Research: HTML forms/validation → AC scenarios (Phase 1 Step 3)
  • Fallback search: requirements.md, tech_stack.md if Epic incomplete (Phase 1 Step 4)
  • Only ask user for missing info after Epic extraction AND frontend AND fallback search fail
Delegation:
  • Orchestrator loads metadata only: ID, title, status (~50 tokens per Story)
  • Workers load full descriptions: 8 sections (~5,000 tokens per Story)
  • Token efficiency: 10 Stories × 50 tokens = 500 tokens (orchestrator) vs 10 Stories × 5,000 tokens = 50,000 tokens (workers load when needed)

Version: 5.0.0 (BREAKING: Added AC Quality Validation in Phase 3 (completeness: happy path + errors + edge cases; specificity: HTTP codes + timing). Updated INVEST Independent criterion with forward dependency check. Added Database Creation Principle to Story Grouping Guidelines per BMAD Method best practices.) Last Updated: 2026-02-03
Story内容:
  • 先研究后创建: 生成Story前务必执行阶段2的标准/模式研究
    • Story层级: 标准/模式(OAuth RFC 6749、中间件模式)
    • 任务层级: 库选择(authlib vs oauthlib)- 由ln-300委托处理
  • 业务导向的Story: 每个Story = 用户旅程(用户做什么、得到什么),而非技术任务
    • ✅ 合理:"作为API客户端,我希望刷新过期令牌,以便无需重新认证即可维持会话"
    • ❌ 不合理:"在API中创建令牌刷新端点"(任务,非Story)
  • 垂直切片: 每个Story交付端到端功能(UI → API → 服务 → 数据库)
  • 单功能Story: 明确、聚焦的角色 + 功能 + 价值
  • 可测试的AC: Given-When-Then格式、3-5条AC、具体标准("<200ms"而非"快")
  • 测试策略: Story创建时包含该部分但为空(测试用例后续由ln-510-test-planner规划)
  • 标准研究: 所有Story的技术说明中需包含阶段2的研究结果
Story分解:
  • 先分解后对比: 先构建理想计划再检查现有内容 - 避免受次优结构影响
  • INVEST验证: 每个Story都需符合INVEST标准
  • 规模强制: 3-5条AC、6-20小时工作量
  • 避免过度分解: <3条AC、<6小时 → 合并Story
用户交互:
  • 优先从Epic提取: 阶段1步骤2中优先从Epic提取所有规划信息,再询问用户
  • 前端研究补充: HTML表单/验证规则 → AC场景(阶段1步骤3)
  • 备用搜索补充: 若Epic信息不完整,使用requirements.md、tech_stack.md补充(阶段1步骤4)
  • 仅询问缺失信息: 仅当Epic提取、前端研究、备用搜索均失败时,才请求用户补充
委托优化:
  • 协调器仅加载元数据: ID、标题、状态(每个Story约50令牌)
  • 处理模块加载完整描述: 8个部分(每个Story约5000令牌)
  • 令牌效率: 10个Story × 50令牌 = 500令牌(协调器) vs 10个Story × 5000令牌 = 50000令牌(处理模块按需加载)

版本: 5.0.0(重大更新:阶段3添加AC质量验证(完整性:正常流+错误处理+边界场景;具体性:HTTP码+时间)。更新INVEST独立性标准,增加前置依赖检查。根据BMAD方法最佳实践,在Story分组指南中添加数据库创建原则。) 最后更新: 2026-02-03