Pre-Mortem Analysis

事前验尸分析

Imagine the plan has completely failed, then work backward to identify what went wrong and how to prevent it.
假设计划已彻底失败,再逆向推导找出问题所在及预防方法。

Instructions

操作步骤

Set the scene: "It's [timeframe] in the future. This initiative was a complete disaster. Looking back, what happened?"
Generate failure scenarios without filtering for likelihood—get everything on the table first, then prioritize.
设定场景:"现在是未来的[某个时间点]。这项举措彻底失败了。回头看,问题出在哪里?"
先不受可能性限制地列举失败场景——先把所有可能都摆出来,再进行优先级排序。

Output Format

输出格式

The Plan Summarize what's being attempted and the success criteria.
Time Jump "It's [X months] later. This has failed completely. The outcome: [describe the disaster vividly]."
What Went Wrong
Generate 8-12 plausible failure causes across categories:
CategoryFailure ModeHow It Played Out
Execution[What failed][The story of how]
External[What failed][The story of how]
People[What failed][The story of how]
Technical[What failed][The story of how]
Assumptions[What failed][The story of how]
Risk Prioritization
Failure ModeLikelihoodImpactPriority
...High/Med/LowHigh/Med/Low1-5
Top 3 Risks & Mitigations
For each top risk:
  • Risk: [Description]
  • Early Warning Signs: What would indicate this is happening?
  • Prevention: How to reduce likelihood
  • Mitigation: How to reduce impact if it occurs
  • Owner: Who's responsible for watching this?
Pre-Mortem Insights What did this exercise reveal that wasn't obvious before?
Revised Confidence After this analysis, how confident are you in success? What would increase confidence?
计划内容 概述当前尝试推进的事项及成功标准。
时间跳转 "[X个月]后,这项举措彻底失败了。最终结果:[生动描述失败的具体情况]。"
问题根源 从以下类别中生成8-12个合理的失败原因:
类别失败模式具体过程
执行层面[哪里出了问题][问题发生的具体过程]
外部因素[哪里出了问题][问题发生的具体过程]
人员因素[哪里出了问题][问题发生的具体过程]
技术层面[哪里出了问题][问题发生的具体过程]
假设偏差[哪里出了问题][问题发生的具体过程]
风险优先级排序
失败模式发生概率影响程度优先级
...高/中/低高/中/低1-5
Top 3风险及应对措施
针对每个顶级风险:
  • 风险: [描述内容]
  • 预警信号: 哪些迹象表明该风险正在发生?
  • 预防措施: 如何降低发生概率
  • 缓解措施: 若风险发生,如何降低影响
  • 负责人: 谁负责监控该风险?
事前验尸分析洞察 本次分析揭示了哪些之前未被发现的问题?
修订后的信心指数 经过本次分析,你对成功的信心如何?哪些因素能提升信心?

Guidelines

指导原则

  • Be vivid and specific—"the database corrupted" not "something went wrong"
  • Include uncomfortable possibilities (key person leaves, competitor moves, we were wrong)
  • Don't filter for "that won't happen"—the point is to surface hidden concerns
  • Assign real owners to mitigations
  • Look for single points of failure
$ARGUMENTS
  • 描述要生动具体——比如"数据库损坏"而非"出了点问题"
  • 纳入令人不安的可能性(核心人员离职、竞争对手行动、我们的判断错误)
  • 不要过滤"不可能发生"的情况——目的是挖掘潜在隐患
  • 为应对措施分配具体负责人
  • 寻找单点故障点
$ARGUMENTS